Filler is used when no combination of modular molding can cover the surface of the formwork or make it easy to open the formwork. Filler is one of the concrete formwork equipment. In the implementation stages of concrete molding or concrete metal formwork, sometimes there is an empty space that cannot be filled with the standard dimensions of the concrete formwork, so for molding the empty space created from the concrete formwork filler or the same metal formwork filler is used Fillers have different cross-sections, and the advantage of making fillers is that this tool is used to repair the formatting of surfaces less than 10 cm wide. This product has different uses in the formatting system, which in the rest of this article Omran Sanat Paya will clarify these differences for you.
In many cases of molding, especially in the structure of angular walls and column heads, where the molding starts from several pieces and reaches each other, there may be gaps that need a filler. The meaning of filler is the same as filler. These fillers have different sections and molding systems, for example, formwork fillers are used to cover very small distances, in cases where it is not possible to open the formworks due to limited space, using these fillers is necessary. and also when we have the possibility to move the entire molding system with a crane, by placing filler between the large panels, we can easily separate the integrated and large panels from each other and from the concrete surface.
Filler is one of the auxiliary tools in formatting. The installation and implementation of the molding filler is in such a way that it has a sliding mode on one side so that it can be moved on the formwork plate in such a way that it covers the distances of half to ten centimeters. Fillers have many uses. The production of filler has caused all the spaces that are not possible with standard modular formworks to be completely covered and the formworks can be opened in any space. It should be mentioned that in the concreting of closed sections as well as slabs, the use of filler is effective and highly recommended because it is easy to open the formworks. Filler is one of the concreting equipment that Omran Sanat Paya provides.
Wall formwork filler: The implementation of wall molding is of particular importance. To fully enjoy the benefits of wall molding, the connection between the various elements of this molding must be strong enough to ensure its safety and integrity. In the implementation of wall molding, there may be gaps that can be filled with filler. Fillers are actually fillers. They are tools that fit into the confined spaces of the formwork and prevent the formwork from opening (without damaging the concrete or forms). They can be used to repair the molding of surfaces with a width of less than 10 cm.
In general, fillers are used in all activities related to concreting that require molding, in which gaps and gaps are created. Filler is also needed in the implementation of wall formatting. Filler is used in wall molding, especially for angled walls and headstones, whose molding starts from several pieces and reaches each other, and there is a possibility of gaps and openings between the pieces.
It plays an effective role in ensuring the absence of seams and gaps in the form of filling materials. Fillers have different sections and molding systems, and one of the advantages of using filler materials for wall molding is that if we intend to move the wall molding system, we can easily separate it from the concrete surface.
Roof formwork filler: The roof is one of the important components of the building and acts as a protector against most of the physical factors of the environment. From the point of view of structural engineers and contractors who carry out construction projects, the correct implementation of a roof along with the correct calculation, calculated techniques are very important.
In this way, depending on the type of roof, auxiliary equipment, different materials are used, which help to speed up and work more accurately in the execution of the roof. How to do the roof molding is one of the things that makes the structure durable and long-lasting. In the process of molding the roof, sometimes there remains a space that cannot be filled with defined and standard dimensions of concrete, so filler materials are used to formwork the empty spaces. Filler is used to cover gaps that are not possible using formatting. Also, it is necessary to use a filler in limited formatting spaces where it is not possible to open the templates.
The space and gap in the molding reduces the safety of the building. The filler makes the structure stronger and more durable. (People should always carry out structural plans in a principled way, otherwise the safety of the building will be at risk.)
The well-known Omran Sanat Paya brand is a supplier of up-to-date equipment and quality construction materials using the power and creativity of experienced engineers. This manufacturer offers filler, which is one of the concreting equipment, with high quality to its users.
Today’s construction industry is at a stage where concrete plays an important role. The first stage of construction of concrete structures is called molding. In the implementation of formatting, equipment called filler is needed. In most cases, especially in circular structures and slabs whose molding starts at two or more points and the panels meet at one point, a gap is created between them. Filler is used to fill this space. This tool prevents the template from opening and is used to repair the formatting. The cross section of the filler is T-shaped. They can be used for formatting with small sections of standard values. Other uses of concrete filler formwork include the following: